dogcatcher
Website Member
Posts : 3947
|
28/10/2018 : 13:08:27
i thought someone else would of brought this up ,but i cant see for the life in me why there is a 4 way light system in op in silsden ,there only a small hole by clog bridge,the queue into silsden is back to the roundabout all the time and up bolton rd aways. |
|
Peter
Website Member
Posts : 4859
|
28/10/2018 : 13:18:51
this post has been edited 1 time(s)
Ah, but did anyone ask you, or anyone, about the consequence of any lights at that junction?
Highways take note. 
|
|
dexter
Website Member
Posts : 590
|
28/10/2018 : 14:18:34
I noticed this as well, and phoned Yorkshire Water. They are sending someone to look at the lights, and whether they can be eased to help traffic Let's see what happens |
|
wheelaman123
Website Member
Posts : 353
|
28/10/2018 : 14:39:51
Because of the digging and the plant that is required to carry out this work it has left Clog bridge with only half the road in use and as a result there is a need for traffic control. When i came past at 11-30am they were filling in the trench that had be made. |
|
dexter
Website Member
Posts : 590
|
28/10/2018 : 14:57:22
quote posted by wheelaman123
Because of the digging and the plant that is required to carry out this work it has left Clog bridge with only half the road in use and as a result there is a need for traffic control. When i came past at 11-30am they were filling in the trench that had be made. Yes.... but why leave all the lights on for the rest of the day, with no one working there? That's why I phoned up, and Morrison's will visit, hopefully... |
|
Peter
Website Member
Posts : 4859
|
01/11/2018 : 10:47:38
AGAIN THIS WEEKEND
Clog Bridge, Silsden, Bradford 03 November — 04 November Delays possible Traffic control (multi-way signals) Works location: Clog Bridge from Jnc with Keighley Road to Hainsworth Road...
|
|