Town Hall Steering Group minutes 16 Oct 2013
SilsdenTownHall_Steering_Group_Minutes_16-10-13 – the complete minutes of the meeting
Welcome and Introductions |
Works are progressing well and on schedule in accordance with the programme plan.The hall will definitely be open for the Christmas Market but may need to close for approximately one week after to complete any snagging etc.Undercoat has started going on the wall in some areas.
The new lights have been ordered for the main hall including down lighters and up lighters. The ground floor windows are currently being refurbished. The new fire escape is being erected. New radiators are being fitted in the former bar area. A new hot water system is being installed to service the kitchen and bar area. The gables are being refurbished above the old ceiling height. A storage area is being created accessible from the ground floor ladies w.c. The Library furniture is going to be ordered imminently. A refurbished white board is to be installed in the meeting room. Pin boards are to be fit around the walls of Dining Room and painted to match, these will be used for art exhibitions etc. Concern was raised regarding the scheme in relation to disabled access in particular the width of the downstairs disabled w.c. which will be 150mm (6”) narrower than the Disabled access concerns Concern was expressed how the upper floor may be unsuitable for persons in wheel chairs because of fire safety reasons. This will be locally managed through the establishment of appropriate procedures. NSG confirmed that the building is now safer with the installation of a new fire alarm, fire compartmentalisation, safety glass and lighting on windows on fire route from the rear, new fire escape. ..pram parking? |
Details and Finishes:Concern was expressed over the use of burgundy as a block colour on the walls of the the colour scheme! Green is proposed as an accent colour for the ground floor which has been picked up from the terratso floor in the hallway. The group expressed their opinion that the green should be kept quite light as darker greens can be a cold colour. All agreed. Vinyl coverings are suggested to be green/cream although concern was expressed that this needs to be a warmer bolder colour and not too light as this will show up marks more easily. Project team to review and confirm at next meeting. |
Any Other Businessfiredoor security SM agreed a review would be undertaken and the expertise and advice of the Council’s Compliance Officer would be sought and adjustments made according to his specification. free fire exits? Access was requested to the building to view the changes and storage requirements. NSG pointed out the building was covered by the Construction Design Maintenance (CDM) Regulations and that only authorised persons wearing Personal Protected Equipment (PPE). All agreed that storage would be reviewed after the opening to ensure that provision was suitable to meet needs. NSG is to meet with Public Halls and Libraries to discuss how the building is to be used safely, fire precautions, training for users and responsibilities. The date of the next meeting was not discussed a provisional date subject to agreement is the 20th of November at 5:00 p.m. in Silsden Town Hall! All of the building users prior to the refurbishment are invited to attend along with other interested parties to have a preview of the hall and feed in their suggestions for the finishing touches. Please note: the ramp? The official opening NOTE The above are selected points from the minutes, please read the full minutes by selecting this link. |
Leave a Reply
Want to join the discussion?Feel free to contribute!